Client: ATCO / Bird Construction (Two Rivers Lodging Group)

Services: Proposal Management (RFQ, RFP)

Project: BC Hydro issued a Request for Qualifications in March 2014 and received 11 responses. In September 2014, BC Hydro shortlisted three proponent teams to provide proposals for worker accommodation at the dam site. BC Hydro selected Two Rivers Lodging Group as the preferred proponent for the Site C worker accommodation contract. They will provide the design, construction, partial financing, operation, and maintenance for workers accommodation at the Site C dam site.

Two Rivers Lodging Group is made up of ATCO Structures & Logistics Ltd. and Bird Design Build Construction Inc. ATCO and Bird have extensive experience in the area of designing, constructing and operating worker accommodation facilities.

The worker accommodation for Site C will be built to house approximately 1,600 workers, with services and utilities designed to accommodate a total capacity of 2,200, if required. To minimize the impact on nearby communities, the camp will be self-sufficient and designed to accommodate the fluctuating number of workers.

Outsource Marketing managed all aspects of proposal design and development for both the RFQ and RFP stages.

The Site C Clean Energy Project will be a third dam and hydroelectric generating station on the Peace River in northeast British Columbia. It will provide 1,100 megawatts (MW) of dependable capacity, and produce about 5,100 gigawatt hours (GWh) of electricity each year to the province’s integrated electricity system. In December 2014, the Site C project received approval from the provincial government to proceed to construction. Construction of the project is planned to start in summer 2015 and be complete in 2024.

 